On July 23th, 1959


As discussed with the leaders, President Ho Chi Minh said that “After we gain independence from our Vietnam war, we hope that Soviet Union in general tỷ lệ kèo nhà cái net Azerbaijan in particular will help us to build up our oil tỷ lệ kèo nhà cái net gas industry as Baku’s”. The statement represented our Ho Chi Minh’s leadership vision tỷ lệ kèo nhà cái net desire for the development of Vietnam petroleum industry.

On November 27th, 1961


On November 27th 1961, Vietnam General Department of Geology tỷ lệ kèo nhà cái net Minerals issued Decision 271/ĐC to establish Petroleum Division 36 with the aim to explore tỷ lệ kèo nhà cái net unlock hydrocarbon resources in Vietnam. This decision was driven by the highly assessment of potential prospects in the North Vietnam tỷ lệ kèo nhà cái net Decree 159-CP dated 09/7/1961 to implement exploration activities. The day November 27th, 1961 marked a milestone in the start-up of oil tỷ lệ kèo nhà cái net gas exploration in Vietnam tỷ lệ kèo nhà cái net was therefore choosen to become the Traditional Day of Vietnam petroleum industry.

On March, 1975


Tien Hai gas field was the first discovery made in Vietnam, contained about 1.3 billion cubic meter (bcm) of gas in place tỷ lệ kèo nhà cái net above 600 million cubic meter of gas recoverable resources. The field was estimated as a small deposit, however it was an encouraging development for our exploration activities tỷ lệ kèo nhà cái net received the great attention from our government leaders. After pilot production phase, the field had been developed through an effective production plan with output of 45-50 million cubic meter per day. Natural gas will be supplied to industrial customers including power plant, ceramic, glass manufacturing facilities… located in Thai Binh Province of Vietnam.

On September 3rd, 1975


Vietnam Oil tỷ lệ kèo nhà cái net Gas General Department (formerly Vietnam Oil tỷ lệ kèo nhà cái net Gas Department) was created by the Government Council Decision 170/CP, acted as a state-owned official organization to explore, produce tỷ lệ kèo nhà cái net process oil tỷ lệ kèo nhà cái net gas, from both onshore tỷ lệ kèo nhà cái net offshore fields in Vietnam. The day September 3rd, 1975 was recognized as the formation of PetroVietnam.

On September 9th, 1977


Government issued Decision 251/CP to establish Vietnam Oil tỷ lệ kèo nhà cái net Gas Company, a subsidiary of Vietnam Oil tỷ lệ kèo nhà cái net Gas General Department.

On July 3rd, 1980


Vietnam tỷ lệ kèo nhà cái net Soviet Union signed a framework agreement on the cooperation for oil tỷ lệ kèo nhà cái net gas exploration tỷ lệ kèo nhà cái net production in the southern part of Vietnam continental shelf at Kremlin Palace, Moscow. The document was signed by Nguyen Lam, Chairman of Vietnam State Committee for Planning tỷ lệ kèo nhà cái net Baibakov N.K, Chairman of Soviet Union State Committee for Planning, at the witness of General Secretaries Le Duan tỷ lệ kèo nhà cái net Bregionev.

On April 19th, 1981


First gas production was achieved from Miocene interval, Tien Hung formation through well 61, drilled to total depth of 1,146-1,156m in Tien Hai C gas field with a rate of 100.000 cubic meter/day tỷ lệ kèo nhà cái net was delivered to a gas turbin generator of a power plant with capacity 10MW. This success has proved the hydrocarbon potential tỷ lệ kèo nhà cái net tapped exploration activities in Vietnam, initiated for further development of Vietnam oil tỷ lệ kèo nhà cái net gas industry.

On June 19th, 1981


Vietnam tỷ lệ kèo nhà cái net Soviet Union signed an agreement on the establishment of Vietsovpetro Jointventure to implement the geological surveys tỷ lệ kèo nhà cái net production in Vietnam South continental shelf in Moscow. The document was signed by Tran Quynh, Deputy Prime Minister of Vietnam tỷ lệ kèo nhà cái net Katusev K.F, Vice Chairman of Soviet Union Council of Ministers.

>On May 25th, 1984


First exploration well BH-5 in Bach Ho field was spudded by Mikhail Mirchin drillship on December 25th 1983 tỷ lệ kèo nhà cái net first oil flow was delineated on May 25th 1984. The next oil discoveries in Rong field made by June 21th 1985 tỷ lệ kèo nhà cái net in Dai Hung field made by July 18th 1988 had confirmed that Vietnam had the significant hydrocarbon potential tỷ lệ kèo nhà cái net boost our industry to evolve into a new era of development.

On June 26th, 1986


First crude oil ton production from Bach Ho field was reached, marking a breakthrough in oil tỷ lệ kèo nhà cái net gas industry. Vietnam become one of the crude oil producers in the world. Especially, in 1988 Vietsovpetro announced major oil discovery from fractured granitoid basement in Bach Ho field with flow rate of above 1,000 cubic meter/day. Bach Ho was ranked as one of the laggest oil fields in South East Asia area.

On July 6th, 1990


Vietnam Oil tỷ lệ kèo nhà cái net Gas Corporation was formed tỷ lệ kèo nhà cái net under the management of Ministry of Heavy Industry. On July 6th 1990, Chaiman of Council of Ministers signed the Decision 251-CT to appoint Truong Thien as General Director of Vietnam Oil tỷ lệ kèo nhà cái net Gas Corporation.

On April 14th, 1992


The government issued Decision 125-HDBT to settle Vietnam Oil tỷ lệ kèo nhà cái net Gas Corporation under management of Council of Ministers.

On April 17th, 1995


Associated gas from Bach Ho oilfield was delivered via pipeline to the onshore Ba Ria terminal for the supply to Ba Ria power plant. The project was the first one that involved international practices to the implementation proceed, resulted into new project management approaches tỷ lệ kèo nhà cái net setting up new regulations, policies on oil tỷ lệ kèo nhà cái net gas bidding process.

On May 29th, 1995


Vietnam Oil tỷ lệ kèo nhà cái net Gas Corporation was reorganized tỷ lệ kèo nhà cái net under the direct management of the government, engaged in oil tỷ lệ kèo nhà cái net gas business activities from upstream to downstream sector, in locally both on shore tỷ lệ kèo nhà cái net offshore Vietnam, including overseas investment.

On July 09th, 1999


Dinh Co Gas Processing facility project was launched on October 04th 1997, located in An Ngai, Long Dien, Ba Ria Vung Tau city, covering an area of 89,600m2, total capital investment approximately 79 million USD tỷ lệ kèo nhà cái net designed capacity of 1.5 bcm of associated gas per annum.

On December 15th, 2004


Phu My Fertilizer Plant was the first successful project in the national Gas-Power-Fertilizer development program that reached its 03 targets of project quality, progress (within 34 months) tỷ lệ kèo nhà cái net proficiency. The plant was constructed with licensed technologies from Danish Haldo Topsoe tỷ lệ kèo nhà cái net Italian SnamProgetti to produce amoniac tỷ lệ kèo nhà cái net prilled urea. Total capital investment for this project was 380 million USD, saving 65 million USD from its initial cost estimates.

On August 29th, 2006


Vietnam Oil tỷ lệ kèo nhà cái net Gas Corporation was changed to Vietnam Oil tỷ lệ kèo nhà cái net Gas Group under the Decision 198/2006/QĐ-TTg tỷ lệ kèo nhà cái net Decision 199/2006/QĐ-TTg to enhance its business model efficiency towards sustainable development strategy to 2015, oriented to 2025, acting as the parent company with its subsidiaries.

On September 23th, 2006


PetroVietnam signed a production sharing contract with Petrofac, Petronas Carigali tỷ lệ kèo nhà cái net Kufpec for PM-304 Block, eastern Peninsular Malaysia in Malay Tho Chu basin, covering total area of 10,260 km2. According to the terms of the PSC, Petrofac acted as the operator holding 30% participating interest, Petronas Carigali 30%, Kufpec 25% tỷ lệ kèo nhà cái net PIDC – a subsidiary of PetroVietnam - 15%. First oil from Cendor field of this block was achieved on September 23th 2006, output production reached 12,000 barrel of oil per day by November 2006.

On April 04th, 2007


Thanks to the continuous effort of all PetroVietnam’s staffs, Lilama Corporation tỷ lệ kèo nhà cái net international contractors tỷ lệ kèo nhà cái net local authorities, Ca Mau 1 gas to power plant has started up on schedule on April 04th 2007 at 11:40am, generated electricity from the first gas turbin of 250MW tỷ lệ kèo nhà cái net fuel diesel oil system of 230MW. This plant had an important role to meet domestic demand amid power shortage.

On December 27th, 2008


Ca Mau 1, Ca Mau 1 power plants tỷ lệ kèo nhà cái net PM3-Ca Mau gas pipeline tỷ lệ kèo nhà cái net Ca Mau Fertilizer Plant were major projects of PetroVietnam as it moved towards integrated Gas- Power-Fertilizer development strategy, located in Khanh An, U Minh, Ca Mau province in a total area above 200 hectares. Ca Mau 1 tỷ lệ kèo nhà cái net Ca Mau 2 hybrid combined cycles power plants has the total capital investment of 860 million USD, nameplate capacity of 1,500MW tỷ lệ kèo nhà cái net supply more than 9 billion KWh per annum. Natural gas was delivered from the overlapping PM3-Ca Mau block between Vietnam tỷ lệ kèo nhà cái net Malaysia via PM3-Ca Mau pipeline which had a total length of 300km tỷ lệ kèo nhà cái net capacity of 2 bcm of gas per year, capital investment of 300 million USD.

On January 19th, 2009


PetroVietnam was awarded the State “Hero of Labour” title by President of the Social Republic of Vietnam Nguyen Minh Triet. The receiving ceremony was held at National Convention Center in My Dinh, Ha Noi with the attendance of all PetroVietnam employees. Since the first crude oil ton was produced in 1986, PetroVietnam had contributed approximately 20% of state revenues, accounted for about 20% of national merchandised export.

On June 13th, 2010


PetroVietnam held the second Patriotic Emulation Congress in Ha Noi tỷ lệ kèo nhà cái net was granted the “Gold Star Order” – the highest honorable award of the State tỷ lệ kèo nhà cái net Government by Prime Minister Nguyen Tan Dung. The award reflected high recognition for PetroVietnam’s great contribution toward national development tỷ lệ kèo nhà cái net for the benefits of the society. After more than 50 years, PetroVietnam tỷ lệ kèo nhà cái net all employees had been actively implementing its priorities tỷ lệ kèo nhà cái net strategies for the sustainable development tỷ lệ kèo nhà cái net global integration.

In 2011


PetroVietnam announced the launch of new Tam Dao 03 Jack-up Drilling Rig, the first one locally manufactured by PetroVietnam Marine Shipyard – a subsidiary of PetroVietnam. The platform was designed to work in up to 90m water depth tỷ lệ kèo nhà cái net able to drill up to 6,100m with total weight nearly 12,000 tons tỷ lệ kèo nhà cái net 145m leg lengths. This rig was built to international standards tỷ lệ kèo nhà cái net high technology which was certified by American Bureau of Shipping tỷ lệ kèo nhà cái net demonstrated the country's engineering capability to become one of top three Asian tỷ lệ kèo nhà cái net top ten global jack-up rig builder.

On January 06th 2011


PetroVietnam announced the inauguration ceremony of the first Dung Quat Oil Refinery in Binh Son, Quang Ngai province with the attendance of Prime Minister Nguyen Tan Dung. Dung Quat Oil Refinery covered in an area of 336 hectares in land tỷ lệ kèo nhà cái net 471 hectares of sea, with capacity of 6.5 million crude oil ton per annum tỷ lệ kèo nhà cái net was the national major project to boost downstream industry, aiming to develop the key economic region of central Vietnam. Refinery products included LPG, gasoline 92/95, kerosene, jet fuel, diesel, fuel oil, sulfur tỷ lệ kèo nhà cái net polypropylene (PP). This project reflected the landmark development of PetroVietnam to become fully integrated model, ranging from upstream to downstream, from exploration to production, processing industry, gas industry, gas to power/fertilizer tỷ lệ kèo nhà cái net high technical services.

On September 17th 2015


Vung Ang 1 thermal power plant had been operational with designed capacity of 1,200MW including 2 trains (600MW/unit), train 1 started up on December 31th 2014 tỷ lệ kèo nhà cái net train 2 started up on May 12th 2015. This plant was built with advanced direct-fired technology, high efficiency tỷ lệ kèo nhà cái net in line with the environment standards which can supply 7.2 billion Kwh per year.